About this Research Topic
New complementary concepts have emerged, particularly the Last-Planner system, the Takt-Time and the Space Planning. Their objective is to increase collaboration, to ensure smooth flows of information, to improve productivity, to reduce all types of wastes in the process and to stabilize production. In addition, Space and Takt-Time planning links the spatial and temporal aspects, promotes efficient use of the site, defines optimal site occupancy rates, and ensures suitable rotation of the workforce in the different spaces.
Space planning and spatiotemporal implementation will improve the management of building construction projects. In view of the importance of these concepts, we are launching this Research Topic, which is aiming to report and discuss the most recent findings by researchers and professionals in this domain. The themes to be covered are as follows:
• Spatiotemporal scheduling techniques
• Deterministic or stochastic optimization process based on space planning
• Graphical optimization process based on space planning
• Modeling of procurement system, material flow and circulation on construction site
• Optimizing of procurement system, material flow and circulation on construction site
• Scheduling visual communication and information flow
• Takt-time planning
• Case studies
• Other related topics
Keywords: Space Planning, Schedule Optimization, Schedule Graphical Modeling, 4D, Construction Industry
Important Note: All contributions to this Research Topic must be within the scope of the section and journal to which they are submitted, as defined in their mission statements. Frontiers reserves the right to guide an out-of-scope manuscript to a more suitable section or journal at any stage of peer review.