AUTHOR=Malito John , Mohrig David TITLE=Unintended consequences of modifying coastal river systems JOURNAL=Frontiers in Marine Science VOLUME=11 YEAR=2024 URL=https://www.frontiersin.org/journals/marine-science/articles/10.3389/fmars.2024.1492435 DOI=10.3389/fmars.2024.1492435 ISSN=2296-7745 ABSTRACT=
Coastal infrastructure projects, particularly the modification of coastal river channels, are becoming increasingly significant to economic activities worldwide as a response to climate-driven changes and urbanization. The benefits of channel modification projects can be realized quickly, but the altered movement of sediments in the river channel can lead to unintended geomorphic changes years or decades later. An example of this is the closure of the San Bernard River mouth, located on the central coast of Texas, which was clogged with sediments by the 1990s as a result of two major projects in the area: the diversion of the Brazos River channel (1929) and the construction of the Gulf Intracoastal Waterway (GIWW) (1940s). The objective of this study was to a) document the delayed geomorphic response to the projects using a GIS analysis of historical maps and aerial imagery, and b) provide a snapshot of altered flow pathways in the area using measurements collected