Skip to main content

CORRECTION article

Front. Energy Res., 01 October 2024
Sec. Smart Grids
This article is part of the Research Topic Advanced Operation and Control of Distributed and Grid-Scale Energy Storage in Modern Low-Voltage Power Systems View all 10 articles

Corrigendum: Dynamic pricing optimization for commercial subcontracting power supplier engaging demand response considering building virtual energy storage

Huang HuangHuang HuangYifei Ning
Yifei Ning*Yunhao JiangYunhao JiangZhihui TangZhihui TangYong QianYong QianXin ZhangXin Zhang
  • Nanjing Power Supply Company of State Grid Jiangsu Electric Power Co., Ltd., Nanjing, China

A Corrigendum on
Dynamic pricing optimization for commercial subcontracting power supplier engaging demand response considering building virtual energy storage

by Huang H, Ning Y, Jiang Y, Tang Z, Qian Y and Zhang X (2024). Front. Energy Res. 11:1329227. doi: 10.3389/fenrg.2023.1329227

In the published article, there was an error in the Funding statement. “The author(s) declare that financial support was received for there search, authorship, and/or publication of this article. This study was supported by the Technology Project of State Grid Jiangsu Electric Power Company (Grant No. J2022096). The funder was not involved in the study design, collection, analysis, interpretation of data, the writing of this article, or the decision to submit it for publication”. The correct Funding statement appears below.

Funding

The author declare that financial support was received for there search, authorship, and/or publication of this article. This study was supported by the Technology Project of State Grid Jiangsu Electric Power Company (Grant No. J2022096).

The authors apologize for this error and state that this does not change the scientific conclusions of the article in any way. The original article has been updated.

Publisher’s note

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.

Keywords: commercial buildings, demand response, demand-side resources, stackelberg game, virtual energy storage

Citation: Huang H, Ning Y, Jiang Y, Tang Z, Qian Y and Zhang X (2024) Corrigendum: Dynamic pricing optimization for commercial subcontracting power supplier engaging demand response considering building virtual energy storage. Front. Energy Res. 12:1498767. doi: 10.3389/fenrg.2024.1498767

Received: 19 September 2024; Accepted: 23 September 2024;
Published: 01 October 2024.

Approved by:

Frontiers Editorial Office, Frontiers Media SA, Switzerland

Copyright © 2024 Huang, Ning, Jiang, Tang, Qian and Zhang. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.

*Correspondence: Yifei Ning, MjQyOTI1MjU4NUBxcS5jb20=

Disclaimer: All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.