Skip to main content

EDITORIAL article

Front. Ecol. Evol.
Sec. Conservation and Restoration Ecology
Volume 12 - 2024 | doi: 10.3389/fevo.2024.1471146
This article is part of the Research Topic Large-Scale Dam Removal and Ecosystem Restoration View all 25 articles

Editorial: Large-scale dam removal and ecosystem restoration

Provisionally accepted
  • 1 United States Geological Survey (USGS), United States Department of the Interior, Reston, United States
  • 2 Institut National de recherche pour l’agriculture, l’alimentation et l’environnement (INRAE), Paris, Auvergne, France

The final, formatted version of the article will be published soon.

    Keywords: dam removal, Ecosystem restoration, infrastructure, river, Synthesis, watershed

    Received: 26 Jul 2024; Accepted: 30 Jul 2024.

    Copyright: © 2024 McCaffery, Duda, Soissons and Roussel. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) or licensor are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.

    * Correspondence: Rebecca McCaffery, United States Geological Survey (USGS), United States Department of the Interior, Reston, United States

    Disclaimer: All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.