Skip to main content

CORRECTION article

Front. Earth Sci., 19 July 2021
Sec. Geohazards and Georisks

Corrigendum: Erosion Rate of Lateral Slope Deposit Under the Effects of Different Influencing Factors

  • 1Key Laboratory of Mountain Hazards and Surface Process/Institute of Mountain Hazards and Environment, Chinese Academy of Sciences, Chengdu, China
  • 2CAS Center for Excellence in Tibetan Plateau Earth Sciences, Beijing, China
  • 3China Railway Changjiang Transport Design Group Co., Ltd, Chongqing, China

A Corrigendum on:
Erosion Rate of Lateral Slope Deposit Under the Effects of Different Influencing Factors

by Ge Y., Guo X., Zhan M., Yan H., Liao Y. and Yu B. (2021). Front. Earth Sci. 9:670087. doi:10.3389/feart.2021.670087

In the published article, we had included Yansen Liao and Bin Yu as authors. They, however, have had limited contributions to the article and do not cover the complete requirement criteria for authorship. Therefore, they have been removed from the list of authors. The corrected Author Contributions statement appears below.

Further, there is an error in the Acknowledgments statement. In the original article, we included the funder “open funding (SKLGP2017K013).” This funder has now been removed. The corrected Acknowledgments statement appears below.

Author Contributions

YG: contributions to the conception, design of the work; drafting and revising the manuscript, and provides the finance support. XG: contributions to the conception, design of the work; analyzing the data, drafting and revising the manuscript. MZ: contributions to the experiments and initial data analysis. HY: contributions to the experiments and initial data analysis.

Acknowledgments

This research is supported by the NSFC (41790432 and 41977257), Strategic Priority Research Program of the CAS (XDA23090203), and Western Light of Young Scholars, CAS. We thank James Buxton MSc from Liwen Bianji, Edanz Group, China (www.liwenbianji.cn/ac), for editing the English text of this manuscript. The authors apologize for these errors and state that this does not change the scientific conclusions of the article in any way. The original article has been updated.

Keywords: lateral deposit, soil failure, erosion rate, runoff, slope

Citation: Ge Y, Guo X, Zhan M and Yan H (2021) Corrigendum: Erosion Rate of Lateral Slope Deposit Under the Effects of Different Influencing Factors. Front. Earth Sci. 9:730653. doi: 10.3389/feart.2021.730653

Received: 25 June 2021; Accepted: 30 June 2021;
Published: 19 July 2021.

Approved by:

Frontiers Editorial Office, Frontiers Media SA, Switzerland

Copyright © 2021 Ge, Guo, Zhan and Yan. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.

*Correspondence: Xiaojun Guo, YWFyb25ndW9AaW1kZS5hYy5jbg==

Disclaimer: All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.