![Man ultramarathon runner in the mountains he trains at sunset](https://d2csxpduxe849s.cloudfront.net/media/E32629C6-9347-4F84-81FEAEF7BFA342B3/0B4B1380-42EB-4FD5-9D7E2DBC603E79F8/webimage-C4875379-1478-416F-B03DF68FE3D8DBB5.png)
94% of researchers rate our articles as excellent or good
Learn more about the work of our research integrity team to safeguard the quality of each article we publish.
Find out more
CORRECTION article
Front. Built Environ. , 27 October 2017
Sec. Sustainable Design and Construction
Volume 3 - 2017 | https://doi.org/10.3389/fbuil.2017.00063
This article is a correction to:
Spatial–Temporal Analysis of the Heat and Electricity Demand of the Swiss Building Stock
A corrigendum on
Pierre Hollmuller, Pascale Le Strat, Jad Khoury, Martin Patel and Bernard Lachal were not included as an author in the published article. The authors apologize for this error and state that this does not change the scientific conclusions of the article in any way.
In the original article, there was an error (Acknowledgements require change after author addition).
A correction has been made to Acknowledgments:
This research is part of the activities of SCCER FEEB&D, which is financially supported by the Swiss Commission for Technology and Innovation (CTI). The authors thanks the Swiss Federal Statistical Office for the free access to the GWR database.
The authors apologize for this error and state that this does not change the scientific conclusions of the article in any way.
In the original article, there was an error (Author Contribution statement requires change after author addition).
A correction has been made to Author Contribution statement:
SS and PH are the main contributors of the methods described in section “Geo-Dependent Heat Demand.” JK and BL contribute to section “Impact of Large-scale Retrofit on Heat Demand.” PS and SS are the main contributors of the methods described in section “Geo-Dependent Electricity Demand.” MP provided the access to the GEAK database. SS wrote the manuscript.
The authors apologize for this error and state that this does not change the scientific conclusions of the article in any way.
The author list, acknowledgements and author contributions of the original article has been updated.
The authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.
Keywords: geo-depended energy demand, energy consumption by use, building classification, electric load curve, bottom-up model
Citation: Schneider S, Hollmuller P, Le Strat P, Khoury J, Patel M and Lachal B (2017) Corrigendum: Spatial–Temporal Analysis of the Heat and Electricity Demand of the Swiss Building Stock. Front. Built Environ. 3:63. doi: 10.3389/fbuil.2017.00063
Received: 02 October 2017; Accepted: 03 October 2017;
Published: 27 October 2017
Edited and Reviewed by: Nahid Mohajeri, University of Oxford, United Kingdom
Copyright: © 2017 Schneider, Hollmuller, Le Strat, Khoury, Patel and Lachal. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) or licensor are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
*Correspondence: Stefan Schneider, c3RlZmFuLnNjaG5laWRlckB1bmlnZS5jaA==
Disclaimer: All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.
Research integrity at Frontiers
Learn more about the work of our research integrity team to safeguard the quality of each article we publish.