Adoption of prefabrication is essential for improving the urban built environment. However, the existing prefabrication market in China is far from mature. As the stakeholder who conducts construction activities, the contractor is facing a dilemma of lacking steady prefabricated components supply. In this circumstance, a potential solution is that contractors open their own prefabrication factories to guarantee stable component supply. The aim of this research is exploring the key factors for contractors to open prefabrication factories. Firstly, a total of 28 influencing factors were identified from literature. Then, the identified factors were divided into four categories: policy environment, market environment, technological environment, and enterprise internal environment. Through interviews with experienced professionals, a total of 19 factors were selected for future analysis. Based on the 19 factors, a questionnaire was designed and distributed to the experts to rate the degree of mutual influences. The collected data were analyzed using Ucinet6.0 software, and the adjacency matrix and the visual models were established. Finally, through the analysis of node centrality, betweenness centrality, and closeness centrality, the four key influencing factors were determined including mandatory implementation policy, precast concrete component's price, market demand, and contractor's strategic objectives. The results of this study could assist contractors in making decisions of opening their own prefabrication factories toward more sustainable environment.
Introduction
A prefabricated building refers to a building in which all or parts of the building are prefabricated in a factory. These are then transported to construction sites for assembly, connection, and partial cast-in-situ construction (1–3). Compared with traditional construction methods, prefabrication has many advantages (4). First, using prefabricated components is a way to industrialize construction, which greatly improves the duration, quality, and sustainability of the project. It also reduces waste, noise, dust, operation cost, labor demand, and resource depletion of the construction site. In addition, the main components of the prefabricated building are produced in factories, while the assembly of components can be carried out at the same time with other in-situ construction processes (5). Bottlenecks and construction delays are common problems due to inefficient construction site production. Prefabricated components can reduce bottlenecks, improve production rates, and shorten production times (6). In addition, weather does not have significant negative impacts on prefabricated construction assembly and this effectively ensures construction efficiency (7). Furthermore, relevant research results show that prefabricated components generate savings ranging from 4 to 14% of total life-cycle energy consumption. The surrounding urban built environment also benefits from waste reduction and quality control (8). Prefabricated components can be used to control pollution since the pollution resulting from site work has become a big threat to the urban environment. Prefabricated components are constructed on-site by lifting and splicing and thus reduce the workload for in-situ construction, improve the quality control process, and ensure the health and safety of workers (9). Due to the high degree of standardization of prefabricated components, it is possible to adopt digital technologies and information management in the design, production, transportation, and assembly process.
Development of prefabricated construction in China has been ongoing for over 70 years (10–12). However, the development of prefabrication progressed at a slow pace due to some challenges such as quality problems, higher prefabricated component cost (13), and rapid development of in-situ construction (14). Prefabrication is linked in several ways to factory production, assembly construction, information management, and intelligent applications (15). In recent years, with a declining labor force, an increase in employment costs and national sustainable development requirements (16), prefabricated construction has gained more attention. It plays a critical role in realizing the industrialization and modernization of the construction industry (17). Thus, prefabrication has been widely implemented and promoted in China over the past few years.
To promote prefabrication development, the national government has put forward a development goal of having prefabricated buildings make up 30% of all newly built buildings in about 10 years (18). In response to this development goal, more than 30 cities including Shanghai, Chongqing, and Beijing have issued a series of policies to promote prefabrication. In addition, standards and norms have been introduced to promote the implementation of prefabricated construction. They have been shown to play an important role in safeguarding the development of prefabrication in China (19). According to officially released data, a total of 630 million square meters of prefabricated buildings were built in 2020, which accounted for 20.5% of all newly built buildings (20).
Along with the rapid promotion of prefabricated buildings, industries related to prefabrication have developed quickly as well. According to government statistics, a total of 328 national-level prefabricated construction industrial bases and 908 provincial-level industrial bases have been established across the country, which indicates that the market demand for prefabricated components is huge (21). To deal with such a huge demand, prefabrication factories have been opened by different stakeholders including developers, design companies, contractors, and other investors (22). As the stakeholder who is directly involved in the construction process, the contractor has the willingness to open prefabrication factories to preferentially fulfill demand (23). However, as opening a prefabrication factory requires a huge amount of resources (e.g., site, technology, investment), the contractors need to carefully consider their potential decisions of opening prefabrication factories from many aspects. In existing literature, there is a knowledge gap of identifying what are the key factors for contractors to make decisions. Thus, this paper aims to explore the key factors contractors take into consideration when deciding to open prefabrication factories.
Literature Review
Identification of Potential Factors
Potential influencing factors were extracted from previously published relevant literature. After an initial screening, a total of 28 potential influencing factors were identified. Five experienced professionals were then invited to filter the identified potential influencing factors and their opinions on these factors were solicited. Based on their suggestions and comments, nine potential influencing factors were excluded and the remaining 19 factors were classified into four categories according to their attributes as shown in Table 1.
Explanation of the Influencing Factors
The influencing factors can be explained as follows.
Policy Environment
To develop industrialized construction in China, a mandatory implementation policy has been promulgated. According to the 2015 Construction Industry Modernization Development Outline, prefabricated buildings will account for more than 30% of new buildings by 2025 (24). The mandatory implementation policy was promulgated to upgrade existing industrial structures to satisfy green development goals. In essence, the aim of the mandatory implementation policy was to change the traditional construction mode to the prefabrication method, which is an important measure for promoting supply-side structural reform (25). In short, the policy is an essential driving force for promoting the application of prefabrication construction in the construction industry (26).
Economic incentives for manufacturing such as tax reductions have been continuously emphasized. Liang (27) stated that the total value of tax reduction was approximately 2.36 trillion yuan in 2019, which was essential to promote the high-quality development of the manufacturing industry. As equipment accounts for a huge proportion of total costs, a tax reduction policy could help to decrease the total cost and promote high-quality development.
The availability of priority land supply refers to giving priority to providing land for prefabrication factory sites. On the basis of the 2019 Industrial Land Policy Implementation Guidelines, the land supply policy incentive was provided to contractors for transformation and upgrading by local governments (28). Zhou et al. (29) stated that industrial land supply has political connotations as a critical tool in China.
Market Environment
Relevant research shows that opening prefabrication factories is aligned with current market demand in China. This is because the annual market size for the nationwide industrialization of construction is expected to reach 5 trillion yuan in 2025, which would account for about 50% of the total output value of the entire construction industry (30). Market demand refers to the need for prefabricated components which promote technological innovation. The next 10 years will be a golden period of rapid development in the industrialization of construction.
The level of industrial chain maturity directly affects the benefits of contractors, which is based on the relationship between market supply and demand. There are two key nodes in the industry chain, namely the prefabricated components in the production stage and the sales stage (31). Industrial chain maturity in this article refers to a new prefabricated industry chain which is a key part of the construction process.
The competitive pressure for contractors in the construction market is sustained growth, since the construction industry is subject to strong internal competition. The increasingly competitive environment has put various contractors under great pressure. Opening prefabrication factories is the right way to provide developers with better products and services. Contractors can also acquire core competitive prefabricated technology to outshine market competition (32).
To a significant extent, the demand for prefabricated buildings depends on the willingness of developers to accept them. They are the upstream enterprises supplying contractors in the industry chain (33). The willingness of developers to accept prefabricated buildings has led to prefabrication methods that have gone beyond traditional construction constraints. With increasing acceptance of prefabricated technology, contractors will have many new opportunities and challenges in the construction market.
The price of precast concrete components is a vital factor in the cost of any building. This refers to the cost management of prefabricated projects (34). Jiang et al. (35) stated that the selection of prefabricated component suppliers is one of the important links in the housing industry chain and the price of prefabricated components is one of the key factors. The choice on whether to open prefabrication factories or not depends on the profit earned from prefabrication sales.
Industrial support refers to the relevant industrial conditions for prefabricated production, such as the supply of raw materials, transportation conditions, and industrial workers (36). The completeness of industrial support conditions in the region affects the investment, construction, and production costs of prefabricated component factories. Insufficient industrial support capacity will lead to a lack of relevant enterprises in the regional industrial chain and increase the operating costs of enterprises.
Technological Environment
The professional competence of the contractor refers to its technical competence in the prefabricated construction field. It is critical to acquire various key construction techniques to keep up with cutting-edge technology, including systems, specialization, integration, prefabrication, assembly, and information technology (37). Opening prefabrication factories can help improve the professional level of contractors in the prefabricated construction field. Furthermore, the professional competence of a contractor includes its human resources department, as “having the right people” is crucial for success. The financial and quality outcome of a project is highly dependent on the competence of the individual chosen as the site manager (38).
It is crucial to make perfect standard specifications which are related to the design, production, and installation of prefabricated buildings. Vakili (39) stated that maturity of standards was conducive to the production, operation, and sales of prefabricated component factories. Moreover, standards establish requirements that stipulate prefabricated construction processes and products. Related design and technical standards can provide professional expertise to guide contractors in the implementation of prefabricated construction (40).
Enterprise Internal Environment
The internal environment of the company refers to the economic and technological level of the enterprise which may sway its decision to open prefabrication factories. There is no obvious gap in policy awareness among various sectors, so large companies do not have a better understanding of market-based instruments than their small and medium-sized counterparts (41). Li et al. (42) stated that firm size has a significant effect on the willingness of construction enterprises to accept the policy. Small enterprises are restricted by many factors such as capital, technology, and talent. The strategic goals of a contractor guide the direction of development of an enterprise.
Building prefabrication was strongly promoted by local governments, which relies on the in-situ manufacturing and work-site assembly of prefabricated components (17). The strategic objectives of contractors should be aligned with local policies, so that the green benefits of prefabricated building initiatives can be reaped in China. The establishment of prefabrication factories can expand the business scope of the enterprise and enhance the level of specialization in prefabricated buildings. This is conducive to the development of EPC (Engineering Procurement Construction) and other general contracting methods (43).
Prefabricated buildings have the potential for improved quality, productivity, efficiency, safety, and sustainability (44). The perception of contractors has been further enhanced under the mandatory implementation policies. Yu et al. (45) stated that a perception of greater purchasing behavior led to more actual purchasing behavior to a limited extent, which is analogous to the building behavior of contractors who work with prefabrication factories.
The innovative potential of a contractor refers to the innovation present in the construction technology or assembly technology used by the contractor. The level of innovation of Chinese construction enterprises is not ideal, and the innovative potential of construction enterprises must be urgently strengthened at this stage (46). Building prefabrication factories and promoting contractor transformation can effectively enhance the innovative potential of contractors (47).
According to the findings of field interviews, research and applications, prefabricated technologies are deeply affected by the market environment, especially company awareness of prefabrication buildings and prefabrication factories. The willingness of contractors to open prefabrication factories depends on market demand. The competitiveness of traditional buildings is still higher than that of prefabricated buildings in China (48). Huang et al. (49) stated that it was influenced by many factors. The more willing the contractors, the greater the possibility that they would establish prefabrication factories.
The production of prefabricated components is the link between design and construction. It is essential for prefabrication factories to achieve precision manufacturing and quality excellence. The realization of precision manufacturing can effectively avoid or even eliminate waste and uncertainty in the production process, which can improve product quality and production efficiency (26, 50). Contractors have technical and management advantages when establishing prefabrication factories that can help to realize in-plant precision manufacturing and lean construction assembly of prefabricated components at work sites.
Most contractors often pursue the economic benefits derived from developers because the ultimate goal of contractors is to earn a profit. The cost of prefabricated construction is higher than traditional construction due to the uneven distribution of prefabrication factories and high operation costs in China (51). Prefabrication and industrialized building systems confer advantages including shorter project duration, cost savings, enhanced site protection, better product quality, and reduced waste (52). For contractors, opening prefabrication factories can enhance their own industrial capacity. This proposal takes into consideration the life cycle cost and the increased benefits of the final product.
The aim of promoting the sustainable development of prefabricated buildings is to satisfy current and future needs of the construction industry. It also ensures faster progress, cost-effectiveness and construction quality, as well as worker safety (53). Therefore, contractors will pay more attention to construction quality as producing standardized and high-precision prefabricated components can effectively avoid errors caused by manual labor in traditional construction. Furthermore, prefabricated construction technology can effectively optimize construction structure and improve construction quality (54, 55).
Research Methodology
Data Collection
In this study, 11 experienced experts from different stakeholders, such as government (1), research institutes (2), contractors (4), and prefabrication factories (4), were invited to gives scores for the degree of influence of various factors by completing questionnaires. All of the invited experts must have professional experiences more than 5 years and present different stakeholders' viewpoints on opening a prefabrication factory. The first row and the first column of the matrix are the influencing factors, and the values in the matrix represent the degree of influence that each element in the columns has on the elements in the rows. In the questionnaire, the experts were asked to give a score ranging from 0 to 4 to evaluate the degree of influence. A score of 0 means that the element in the column does not influence the element in the row; a score of 1 means the degree of influence is small; a score of 2 means the degree of influence is average; a score of 3 means the degree of influence is large; and a score of 4 means a very high influence.
After collecting the questionnaire results from the experts, Ucinet 6.0 software was used to conduct a consistency analysis to check the expert scoring results. Ucinet 6.0 software was selected because it can deal with the original data as the format of matrix and then provide visible relationships between different influencing factors.
Social Network Analysis
According to the social network theory, actors are resource-competitive and form social relations and social network structures through resource flows. Therefore, the characteristics of the network structure and relationships in the network have important impacts on the actors (56). The relationship structure of social networks can be generally represented by graphs or matrices. There are three main methods of representation used in this article, namely degree centrality, betweenness centrality, and closeness centrality. Among them, degree centrality refers to the degree to which a node is directly related to other nodes. The greater the number of nodes, the greater the power of the node in the social network. The betweenness centrality refers to the ability of a node to control other nodes. The greater the centrality, the larger the number of nodes that need to pass information between each other via this node. The closeness centrality is the reciprocal of the sum of the distances from the node to all other nodes. The larger the value, the easier it is for the node to communicate with other nodes to transfer resources. Social network analysis solves the complex interest relationships between actors or organizations in real life by quantitatively analyzing the social relationships between actors. Therefore, it is widely used in various research fields, such as economics (57), sociology (58), and management (59).
In the field of construction engineering, the decision-making of contractors is influenced by many actors, such as governments, developers, and component manufacturers. This study used social network analysis to identify the power and reputation of actors in the decision-making mechanism for contractors. It provided a basis for the selection of the main body of the social network organization structure. Meanwhile, it can effectively identify key influencing factors in the behavioral decision-making mechanism, analyze the degree of mutual influence, and analyze the decision-making mechanism for contractors when deciding to open prefabrication factories (60).
Network Density Analysis
Network density can reflect the degree of connection between nodes in a network. If the overall social network graph is an undirected relational network with n influencing factors, the theoretical value of the total number of associations is N * (n – 1)/2. If the actual number of associations (which can be considered as the number of connections) contained in the social network is M, the social network density is then equal to m/(n*(n – 1)/2) = 2m/(n/(n – 1)). If the whole social network graph is a directed relational network, the theoretical value of the total number of associations is N * (n – 1) and the network density is equal to M/(n/(n – 1)) (61). In particular, the formula for network density in the directed relational network is:
Degree Centrality Analysis
In the social network diagram, degree centrality refers to the number and intensity of direct or indirect connections (adjacent connections) with a certain node. If the node is located in the center of the social network diagram, the value for degree centrality of this node increases, and more nodes are connected with that point. Degree centrality aims at finding centrality based on the notion that important nodes have many connections as expressed in Equation (2) (61).
where n is the number of nodes in the network and a(pi, pk) is a distance function. a(pi, pk) = 1 if and only if node pi and node pk are connected. Otherwise, a(pi, pk) = 0.
Betweenness Centrality Analysis
Betweenness centrality aims at finding centrality based on the assumption that nodes that connect other nodes are important nodes. Betweenness centrality measures the ability of an influencing factor to control other factors, i.e., other factors can only be related through this factor, and nodes with high betweenness centrality are in the center of the network. The larger the shape of the node, the greater the betweenness centrality of the influencing factor, i.e., the closer to the center of the network the influencing factors are, the stronger the degree of influence on other nodes. The formula used to calculate the degree of centrality is shown in Equation (3), which is used to express betweenness centrality (61).
where gij is the number of geodesics (shortest paths) linking node pi and node pj and gij(pk) is the number of geodesics linking node pi and node pj that contains node pk (62).
Closeness Centrality Analysis
The closeness centrality refers to the ability where the influencing factor cannot be controlled by other factors. It is derived by calculating the sum of the shortest distance between a certain node and all other nodes in the entire network. When the distance between a node and other nodes in the network model is short, it proves that the node is highly capable of mastering and conveying information instead of being easily affected by other nodes. The value can be normalized by using the maximum possible distance between any two nodes in a network of n nodes. This value is n – 1. More precisely, the normalized closeness of node pk is given by (61):
Results and Discussion
Based on the results of the consistency analysis, this study optimizes the scoring data of the experts and obtains a social network analysis matrix (adjacent matrix) of the factors affecting the decision-making mechanism of contractors when it comes to opening a prefabrication factory.
Network Density Analysis Results
Based on the adjacency matrix of influencing factors, Ucinet 6.0 was used to visualize the network association of influencing factors as shown in Figure 1. In Figure 1, there are directional correlations between the influencing factors. The relationships among the influencing factors are indicated by arrows and the number on a specific arrow represents the degree of influence for each node (63).
According to the formula, the network density of the model is 1.4620, indicating that the network graph of influencing factors for the decision-making mechanism regarding the opening of fabrication factories by contractors has a high density (generally, 0.50 is used as the average standard for measuring density). In other words, the network graph of influencing factors changes as a whole with a change in any two factors. Therefore, through the analysis of network density, it can be found that the change in the relationship network caused by the change of each influencing factor. We can then modify the decision-making mechanism for contractors when deciding whether to open a prefabrication factory.
Degree Centrality Analysis Results
The visualization result for degree centrality analysis is shown in Figure 2. The larger the node in Figure 2, the higher the degree centrality of the node. Degree centrality is measured by node in-degree and node out-degree. Node in-degree indicates the number and correlation of other influencing factors directly affecting this factor, and node out-degree indicates the number and correlation of other factors that are directly affected by this influencing factor.
Based on the degree centrality analysis results of the influencing factors, the 19 influencing factors are sorted in a descending order based on their level of out-degree as shown in Table 2. They can be divided into four categories according to their levels of out-degree and in-degree:
a) The out-degree of an influencing factor is large and its in-degree is small. This means that the influencing factor can easily affect other factors, but is not easily affected by other factors (64). It is a spontaneous influencing factor and is the source of influence in the relationship network.
b) The out-degree of an influencing factor is small and its in-degree is large. This means that the influencing factor does not easily affect other factors, but is easily affected by other factors.
c) The out-degree of an influencing factor is large and its in-degree is large. This means that the influencing factor easily affects other factors and is also easily affected by other factors.
d) The out-degree of an influencing factor is small and its in-degree is small, this means that the influencing factor neither easily affects other factors, nor is it easily affected by other factors.
The out-degree and in-degree of the influencing factors are relatively small. This means that such factors do not easily affect other factors and are not easily affected by other factors, meaning that they are independent control factors. Such factors include the innovative potential of a contractor, construction quality, availability of priority land supply, and economic incentives for manufacturing. To improve the role of these factors, it is necessary to start from the factors themselves, such as promoting the development of innovation capabilities and improving innovation through incentives such as efficiency measures.
Influencing Factors With a Higher Out-degree and Lower In-degree
According to the research findings, the influencing factors with higher out-degree and lower in-degree include mandatory implementation policy, market demand, perception of contractors, and professional competence of contractors. Among them, the mandatory implementation policy has the largest out-degree and the smallest in-degree, indicating that this factor is only subject to government management and regulation as an external influence. It can have an impact on most of the factors related to the decision-making mechanism of contractors when opening prefabrication factories. Generally, market demand is only affected by policy environment factors, which will affect the decision-making of the contractor when it comes to factory construction. The perception of the contractor is generally affected by the mandatory policy environment, so its in-degree is relatively small. However, it will have a limited impact on the internal environmental factors of the contractor enterprise, such as the strategic goals of the contractor and the willingness of the contractor to build a factory, so the out-degree is relatively large. The professional competence of the contractor is an attribute of the contractor and is generally only affected by the internal environment of the enterprise, but it will have an impact on the developer and the market environment. For example, the stronger the level of technical competence when it comes to prefabricated construction for the contractor, the more it can promote the acceptance by developers of prefabricated buildings and market recognition of prefabricated buildings. Many cities in China are facing challenges associated with low-carbon transformation (65). As a significant contributor of carbon emissions, the construction industry has been subject to a series of policies promulgated by local governments which encourage them to be more industrialized (66).
Influencing Factors With a Lower Out-degree and Higher In-degree
According to the research findings, the factors associated with small out-degree and large in-degree include the strategic objectives of the contractor, expected economic benefits for the contractor, precision manufacturing, size of contractor enterprise, industrial support, and willingness of the contractor. Such influencing factors do not typically affect other influencing factors, but they are easily affected by other factors. For contractors, their strategic objectives determine their development route, but this is easily affected by changes in mandatory policy and market demand. On the other hand, market demand and mandatory policy do not change with the strategic objectives of the contractor. One of the purposes behind the willingness of a contractor to construct a factory is to reduce the cost of the prefabricated project and obtain more economic benefits. The economic benefits are also affected by the market, technology and policy environment. Some internal environmental factors such as the strategic objectives of the contractor, the expected economic benefits of the contractor, precision manufacturing, size of the contractor enterprise, and the willingness of the contractor to build a factory are easily influenced by policy and market factors. However, they are unlikely to change policy and market factors. Industrial support refers to the upstream enterprises related to the prefabricated component industry within the region. The strength of industrial support is affected by many factors, such as raw material supply conditions of prefabricated components, transportation conditions of prefabricated components, and surrounding production environment conditions. Policy and market factors directly affect related industrial support and the expected economic benefits of contractors after building factories. Precision manufacturing of the contractors is affected by the size of the contractor enterprise and professional competence of the contractor.
Influencing Factors With a Higher Out-degree and Higher In-degree
According to the research findings, the factors associated with large out-degree and large in-degree include developer acceptance of prefabricated buildings, price of the precast concrete components, industrial chain maturity, competitive pressure, and maturity of standards. Developer acceptance of prefabricated buildings directly affects the behavioral decisions of contractors in deciding whether to open fabrication factories. It is also affected by mandatory implementation policy, market demand, and the professional capabilities of contractors. For the contractor, the establishment of prefabrication factories is conducive to improving industrial chain maturity, so as to meet market demand and increase its market competitiveness. It also conforms to national policy guidance for the promotion of prefabricated construction. Developer acceptance of prefabricated buildings not only affects the size of the contractor enterprise and strategic objectives of the contractor, but is also affected by policy and market environment factors. Competitive pressure mainly affects the enterprise's internal environment, such as the strategic objectives of the contractor and the innovative potential of the contractor. It is also affected by the policy environment and the market environment. The price of precast concrete components affects the expected economic benefits of the contractor and the willingness of the contractor to open prefabricated factories. It is closely related to the market and policy environment. With the development of prefabricated buildings, relevant standards, and specifications are constantly being improved. With standards and specifications, a market environment and technological environment can be developed. The formulation of the corresponding rules is also beneficial to contractors when establishing prefabrication factories.
Influencing Factors With a Lower Out-degree and Lower In-degree
According to the research findings, the factors associated with small out-degree and small in-degree include innovative potential of the contractor, construction quality, availability of priority land supply, and economic incentives for manufacturing. To improve the role of these factors, it is necessary to start from the factors themselves, such as promoting the development of contractor innovation capabilities and improving innovation and efficiency incentives for contractors. It is also important to strengthen the implementation of preferential land supply and economic incentive policies for the manufacturing industry. Honorary incentive policies for quality construction of high-quality projects should also be encouraged.
Betweenness Centrality Analysis Results
The visualization results of the centrality analysis of influencing factors are shown in Figure 3. Based on the analysis of the betweenness centrality of the influencing factors, the 19 influencing factors are sorted according to their level of betweenness centrality as shown in Table 3. The average value of the betweenness centrality is 4.789. Overall, the betweenness centrality scores of the influencing factors are highly polarized. Among them, the strategic objectives of contractors, industrial support, developer acceptance of prefabricated buildings, expected economic benefits of contractors, and competitive pressure are higher than average. This indicates that these factors have strong control capabilities and serve as a bridge for other influencing factors to generate multiple correlations.
The betweenness centrality of maturity of standards, professional ability of contractors, construction quality, contractor innovation ability, market demand, contractor awareness of building factories, contractor willingness, manufacturing economic incentives, availability of priority land supply, and mandatory implementation policies are lower than the average value. This indicates that the conduction effect of these factors in the network relationship is weak. Among them, the betweenness centrality of policy factors is 0 or almost 0, which means that almost no relationship between any two influencing factors is transmitted through the influencing factors, so they are at the edge of the network and are hardly connected to other factors.
Closeness Centrality Analysis Results
The visualized results of the closeness centrality for influencing factors are shown in Figure 4.
According to Table 4, the closeness centrality of the influencing factors can be divided based on two indicators: in-closeness centrality and out-closeness centrality. In-closeness centrality means how easy it is for other nodes to reach the node, while out-closeness centrality refers to how easy it is for the node to reach other nodes. These two representations are the reciprocal of the sum of the shortest distance. In general, low in-closeness centrality and high out-closeness centrality indicate that it is not easy for other nodes to reach this node. However, it is easier for this node to reach other nodes. Therefore, the independence of resource output will be high at the edge of the network if the influencing factors have low in-closeness centrality and high out-closeness centrality. High in-closeness centrality and low out-closeness centrality mean that it is easier for the other node to reach this node. It is more difficult for this node to reach other nodes. Therefore, influencing factors with high in-closeness centrality and low out-closeness centrality mainly depend on the resource input of other subjects in the network in the central part of the network.
Based on the analysis results of influencing factors regarding closeness centrality, the in-closeness centrality and out-closeness centrality with 19 influencing factors are summarized in Table 4. For mandatory implementation policies, the conclusion is that in-closeness centrality is low and out-closeness centrality is high. This shows that this influencing factor has high independence from the output of resources at the edge of networks. The strategic objectives of the contractor, industrial support facilities, expected economic benefits for the contractor, precision manufacturing, size of contractor enterprise, the price of precast components, and competitive pressure have relatively high in-closeness centrality and low out-closeness centrality. This means that they mainly depend on the input of resources from other subjects in the center of the network. There are 11 factors including contractor willingness to build prefabrication factories, construction quality, contractor acceptance of prefabricated buildings, maturity of standards, contractor innovation ability, industrial chain perfection, contractor professional competence, contractor perception of prefabrication mode, market demand, availability of land supply, and economic incentive measures that have relatively low in-closeness centrality and out-closeness centrality. It has been demonstrated that these influencing factors are relatively independent in the transmission of resources and are not easily controlled by other influencing factors and therefore they are at the edge of the network.
Discussion
Based on the analysis results, four key influencing factors can be obtained through a comprehensive analysis of node centrality, betweenness centrality, and closeness centrality. More details are explained below.
It can be seen from the results that the mandatory implementation policy has the largest out-degree node as well as larger out-closeness centrality, which shows that this influencing factor tends to influence other factors instead of being easily controlled by other factors. Furthermore, it has a strong ability to dominate other influencing factors. Therefore, mandatory implementation policy can be considered as a key influencing factor in social networks as well as a source which is related to general influencing capability in the network. When node in-degree for mandatory implementation policy is 0, it means that the factor is not influenced by other factors. Mandatory implementation policies can only be decided by functional departments within national and governmental organizations. For example, in 2017, “Suggestions for the implementation on vigorously developing prefabricated buildings” aims to focus on promoting prefabricated buildings and developing new methods of construction.
The price of precast concrete components has the largest node centrality and large in-closeness centrality, which indicates that there are many factors closely connected with this factor. It takes the shortest distance for other influencing factors to reach this influencing factor in the social network. Therefore, the price of precast concrete is a key influencing factor in a social network. Meanwhile, price changes in precast concrete components will have a direct impact on capacity as well as market demands of prefabricated components companies. When starting construction, companies will consider the market price of precast concrete components and forecast expected economic benefits after the construction as references for planning construction project sizes. Moreover, the price of precast concrete components is also greatly correlated with transportation costs (67). Relevant research has shown that transportation costs in the suburbs are higher than those in urban areas (68–70). Therefore, the location where prefabricated components are constructed has a direct link with the economic benefits after construction.
Market demand has large betweenness centrality with low node centrality and closeness centrality. Therefore, it easily influences other factors and also has a strong ability to control other influencing factors instead of being easily influenced by them. This makes it a key influencing factor relating to networks. In the context of mandatory implementation policies, developers have started to develop more prefabricated building projects which lead to an increase in demand for prefabricated components. Construction market demand led by developers can have a positive and direct impact on opening prefabrication factories for contractors. The higher the developer acceptance of prefabricated buildings, the greater the demand for prefabricated components in the market. With the pursuit of economic benefits (63) as the aim, contractors will manufacture more prefabricated components based on market demand so as to meet the needs of developers. Market demand also has a positive impact on industrial chains. Relevant studies have demonstrated that if a company functions in a complex and uncertain business environment, the market demand of suppliers will have a direct and positive impact on the company industrial chains and enhance company performance (71, 72). For contractors, establishing factories for prefabricated components refers to a key link in the improvement of their own industrial chains for prefabricated buildings. After completing the factories, two important points which refer to both production and sales will be established in the industrial chains for prefabricated buildings, thus contributing to the development of companies. The method of lean management by contractors can be applied to production as well as sales to help effectively promote the development of enterprises.
Contractor strategic objectives have maximum betweenness centrality as well as in-closeness centrality with higher node centrality at the same time. This indicates that the factor tends to be influenced by other factors and easily influences other factors as well, thus having a “mesomeric effect” several times and becoming the “bridges” in social networks. Therefore, it is a key influencing factor in social networks. In the context of advancing economic globalization, the selection of development strategies becomes difficult for many companies. However, diversification and specialization are the main business strategies at present. When it comes to development routes of prefabricated buildings for contractors, establishing factories for prefabricated parts, expanding the business scope for companies, and improving specialization in prefabricated buildings will be helpful. In doing so, contractors can progress along the development path for projects involving general contracting as well as EPC which can integrate R&D, design, manufacturing, purchasing, and construction.
Conclusions
Prefabricated construction has many advantages compared with traditional construction methods. However, the contractor may encounter difficulties in obtaining a steady supply of prefabricated components. Establishing self-owned prefabrication factories is a potential solution to solve this problem. The aim of this paper is to explore the key factors for contractors to open prefabrication factories. Relevant data were collected from questionnaires and further analyzed using Ucinet 6.0 to obtain the adjacency matrix and visual models of influencing factors. By using the social network analysis method, degree centrality analysis, betweenness centrality analysis, and closeness centrality analysis were carried out on the influencing factors. The analysis results revealed that mandatory implementation policy, price of precast concrete components, market demand, and contractor strategic objectives were the key factors that influence establishment of prefabrication factories by contractors. The results of this study contribute in revealing the potential mechanism for contractors to open prefabrication factories, thus to reduce carbon emissions and to promote sustainable development. However, this study also has a few limitations. For example, the research data were collected only from Guangdong province. Future research can be carried out across the country.
Data Availability Statement
The original contributions presented in the study are included in the article/supplementary material, further inquiries can be directed to the corresponding author/s.
Author Contributions
PX and JiasZ: conceptualization. JiaZ: methodology. JianZ: validation. PX, ZW, MA-A, and JiasZ: writing, reviewing, and editing—original preparation. All authors have read and agreed to the published version of the manuscript.
Conflict of Interest
JiasZ and JiaZ are employed by China Construction Fourth Engineering Bureau No. 3 Co. Ltd., and JianZ is employed by China State Construction Silk Road Investment Group Co. Ltd.
The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.
Publisher's Note
All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.
Acknowledgments
This work was supported by the Fundamental Research Funds for the Central Universities (2021CDJSKCG31).
References
1. Tam V, Fung I, Sing M, Ogunlana SO. Best practice of prefabrication implementation in the Hong Kong public and private sectors. J Clean Prod. (2015) 109:216–31. doi: 10.1016/j.jclepro.2014.09.045
2. Tam VWY, Tam CM, Zeng SX, Ng WCYB. Towards adoption of prefabrication in construction. Build Environ. (2007) 42:3642–54. doi: 10.1016/j.buildenv.2006.10.003
3. Wu Z, Luo L, Li H, Wang Y, Bi G, Antwi-Afari MF. An analysis on promoting prefabrication implementation in construction industry towards sustainability. Int J Environ Res Publ Health. (2021). 18:11493. doi: 10.3390/ijerph182111493
4. Li L, Li Z, Wu G, Li X. Critical success factors for project planning and control in prefabrication housing production: a China study. Sustainability. (2018) 10:836. doi: 10.3390/su10030836
5. Chiang YH, Chan HW, Lok KL. Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong. Habitat Int. (2006) 30:482–99. doi: 10.1016/j.habitatint.2004.12.004
6. Nam S, Yoon J, Kim K, Choi B. Optimization of prefabricated components in housing modular construction. Sustainability. (2020) 12:10269. doi: 10.3390/su122410269
7. Wu Z, Yu ATW, Poon CS. An off-site snapshot methodology for estimating building construction waste composition - a case study of Hong Kong. Environ Impact Assess Rev. (2019) 77:128–35. doi: 10.1016/j.eiar.2019.03.006
8. Hong J, Shen GQ, Mao C, Li Z, Li K. Life-cycle energy analysis of prefabricated building components: an input–output-based hybrid model. J Clean Prod. (2016) 112:2198–207. doi: 10.1016/j.jclepro.2015.10.030
9. Jaillon L, Poon CS. The evolution of prefabricated residential building systems in Hong Kong: a review of the public and the private sector. Automat Construct. (2009) 18:239–48. doi: 10.1016/j.autcon.2008.09.002
10. Yu S, Liu Y, Wang D, Bahaj AS, Wu Y, Liu J. Review of thermal and environmental performance of prefabricated buildings: implications to emission reductions in China. Renew Sustain Energy Rev. (2021) 137:110472. doi: 10.1016/j.rser.2020.110472
11. Wu Z, He Q, Chen Q, Xue H, Li S. A topical network based analysis and visualization of global research trends on green building from 1990 to 2020. J Clean Prod. (2021) 320:128818. doi: 10.1016/j.jclepro.2021.128818
12. Wu Z, He Q, Yang K, Zhang J, Xu K. Investigating the Dynamics of China's Green Building Policy Development from 1986 to 2019. Int J Environ Res Publ Health. (2021). 18:196. doi: 10.3390/ijerph18010196
13. Xue H, Zhang S, Su Y, Wu Z. Capital cost optimization for prefabrication: a factor analysis evaluation model. Sustainability. (2018) 10:159. doi: 10.3390/su10010159
14. Wang Y, Xue X, Yu T, Wang Y. Mapping the dynamics of China's prefabricated building policies from 1956 to 2019: a bibliometric analysis. Build Res Inform. (2021) 49:216–33. doi: 10.1080/09613218.2020.1789444
15. Lu W, Chen K, Xue F, Pan W. Searching for an optimal level of prefabrication in construction: an analytical framework. J Clean Prod. (2018) 201:236–45. doi: 10.1016/j.jclepro.2018.07.319
16. Wu H, Qian QK, Straub A, Visscher H. Stakeholder perceptions of transaction costs in prefabricated housing projects in China. J Construct Eng Manage. (2021) 147:04020145. doi: 10.1061/(ASCE)CO.1943-7862.0001947
17. Chang Y, Li X, Masanet E, Zhang L, Huang Z, Ries R. Unlocking the green opportunity for prefabricated buildings and construction in China. Resour Conserv Recycl. (2018) 139:259–61. doi: 10.1016/j.resconrec.2018.08.025
18. Jiang W, Luo L, Wu Z, Fei J, Antwi-Afari MF Yu T. An investigation of the effectiveness of prefabrication incentive policies in China. Sustainability. (2019) 11:5149. doi: 10.3390/su11195149
19. Xue H, Wu Z, Sun Z, Jiao S. Effects of policy on developer's implementation of off-site construction: the mediating role of the market environment. Energy Policy. (2021) 155:112342. doi: 10.1016/j.enpol.2021.112342
20. China Ministry Ministry of Housing and Urban-Rural Development Standards and Ratings Department. The Ministry of Housing and Urban-Rural Development Standards and Ratings Department Announcement on the Development of National Prefabricated Buildings in 2020. (2021).
21. Xue H, Zhang S, Su Y, Wu Z. Factors affecting the capital cost of prefabrication—a case study of China. Sustainability (2017). 9:1512. doi: 10.3390/su9091512
22. Wang Y, Li H, Wu Z. Attitude of the Chinese public toward off-site construction: a text mining study. J Clean Prod. (2019) 238:117926. doi: 10.1016/j.jclepro.2019.117926
23. Ferme L, Zuo J, Rameezdeen R. Improving collaboration among stakeholders in green building projects: role of early contractor involvement. J Legal Aff Disput Resol Eng Construct. (2018) 10:04518020. doi: 10.1061/(ASCE)LA.1943-4170.0000278
24. Wu HJ, Liu GW. Chao M. Research on policy path of industrial construction – based on government role analysis. Construct Econ. (2016) 37:24–8. doi: 10.14181/j.cnki.1002-851x.201608024
25. Tian Y, Govindan K, Zhu Q. A system dynamics model based on evolutionary game theory for green supply chain management diffusion among Chinese manufacturers. J Clean Prod. (2014) 80:96–105. doi: 10.1016/j.jclepro.2014.05.076
26. Hong J, Shen GQ Li Z, Zhang B, Zhang W. Barriers to promoting prefabricated construction in China: a cost–benefit analysis. J Clean Prod. (2018) 172:649–60. doi: 10.1016/j.jclepro.2017.10.171
27. Ce L. Tax and fee cuts have boosted high-quality development of manufacturing. China Collect Econ. (2021) 2021:71–72.
28. Lei L, Shuzhi L, Lijun Z, Xin L. Analysis and prospect of industrial land supply in. Land Resour Inform. (2019) 2020:36–40.
29. Zhou L, Tian L, Cao Y, Yang L. Industrial land supply at different technological intensities and its contribution to economic growth in China: a case study of the Beijing-Tianjin-Hebei region. Land Use Policy. (2021) 101:105087. doi: 10.1016/j.landusepol.2020.105087
30. Precast/Prefabricated Construction 2019 Global Trends Market Size Share Status SWOT Analysis and Forecast to 2025 M2 Presswire (2019).
31. Huang J, Ding Q, Wang Y, Hong H, Zhang H. The evolution and influencing factors of international tungsten competition from the industrial chain perspective. Resour Policy. (2021) 73:102185. doi: 10.1016/j.resourpol.2021.102185
32. Li W, Zhao X. Competition or coopetition? Equilibrium analysis in the presence of process improvement. Eur J Oper Res. (2022) 297:180–202. doi: 10.1016/j.ejor.2021.04.031
33. Yanli Z, Chunsheng Z, Liu S. Research on the construction and optimization direction of prefabricated building cost chain – Based on the perspective of real estate enterprises. Const Econ. (2020) 41:57–62. doi: 10.14181/j.cnki.1002-851x.202011057
34. Chang X. Research about the impact of price character on transaction evaluation. In: 2009 ISECS International Colloquium on Computing, Communication, Control, and Management. IEEE. Sanya (2009). doi: 10.1109/CCCM.2009.5267922
35. Jiang L, Li Z, Li L, Gao Y. Constraints on the promotion of prefabricated construction in China. Sustainability. (2018). 10: 2516. doi: 10.3390/su10072516
36. Wei L. Research on the support system of strengthening and rebuilding project in a university. In: Proceedings Volume 12050, International Conference on Smart Transportation and City Engineering. Chongqing (2021). doi: 10.1117/12.2613970
37. Cao S, Tian D, Zhang X, Hou Y. Sustainable development of food processing enterprises in China. Sustainability (2019). 11:1318. doi: 10.3390/su11051318
38. Lidelöw H, Simu K. Understanding construction contractors and their operations strategies. Proc Econ Finan. (2015) 21:48–56. doi: 10.1016/S2212-5671(15)00149-5
39. Vakili K. Collaborative promotion of technology standards and the impact on innovation, industry structure, and organizational capabilities: evidence from modern patent pools. Organ Sci. (2016) 27:1504–24. doi: 10.1287/orsc.2016.1098
40. Luo T, Xue X, Wang Y, Xue W, Tan Y. A systematic overview of prefabricated construction policies in China. J Clean Prod. (2021) 280:124371. doi: 10.1016/j.jclepro.2020.124371
41. Liu X, Yamamoto R, Suk S. A survey of company's awareness and approval of market-based instruments for energy saving in Japan. J Clean Prod. (2014) 78:35–47. doi: 10.1016/j.jclepro.2014.05.005
42. Li J, Liu H, Zuo J, Xia R, Zillante G. Are construction enterprises ready for industrialized residential building policy? A case study in Shenzhen. Sustain Cities Soc. (2018) 41:899–906. doi: 10.1016/j.scs.2018.06.033
43. Georgiev M. Organisation's business planning and strategic decisions. Viln Univ Open Ser. (2021) 2021:20–7. doi: 10.15388/VGISC.2021.3
44. Zhang X, Skitmore M, Peng Y. Exploring the challenges to industrialized residential building in China. Habitat Int. (2014) 41:176–84. doi: 10.1016/j.habitatint.2013.08.005
45. Yu B, Wang J, Liao Y, Wu H, Wong AB. Determinants affecting purchase willingness of contractors towards construction and demolition waste recycling products: an empirical study in Shenzhen, China. Int J Environ Res Publ Health. (2021) 18:4412. doi: 10.3390/ijerph18094412
46. Jiao H, Koo CK, Cui Y. Legal environment, government effectiveness and firms' innovation in China: examining the moderating influence of government ownership. Technol Forecast Soc Change. (2015) 96:15–24. doi: 10.1016/j.techfore.2015.01.008
47. Chen H, Zhong T, Lee JY. Capacity reduction pressure, financing constraints, and enterprise sustainable innovation investment: evidence from Chinese manufacturing companies. Sustainability. (2020) 12:10472. doi: 10.3390/su122410472
48. Du Q, Pang Q, Bao T, Guo X, Deng Y. Critical factors influencing carbon emissions of prefabricated building supply chains in China. J Clean Prod. (2021) 280:124398. doi: 10.1016/j.jclepro.2020.124398
49. Huang C., Ma J., Song K., Homeowners' willingness to make investment in energy efficiency retrofit of residential buildings in China and its influencing factors. Energies (2021). 14:1260. doi: 10.3390/en14051260
50. Wu Z, Yu ATW, Poon CS. Promoting effective construction and demolition waste management towards sustainable development: a case study of Hong Kong. Sustain Dev. (2020) 28:1713–24. doi: 10.1002/sd.2119
51. Ji Y, Chang S, Qi Y, Li Y, Li HX, Qi K. A BIM-based study on the comprehensive benefit analysis for prefabricated building projects in China. Adv Civil Eng. (2019). 2019:3720191. doi: 10.1155/2019/3720191
52. Zairul M. The recent trends on prefabricated buildings with circular economy (CE) approach. Clean Eng Technol. (2021) 2021:100239. doi: 10.1016/j.clet.2021.100239
53. Liu S, Li Z, Teng Y, Dai L. A dynamic simulation study on the sustainability of prefabricated buildings. Sustain Cities Soc. (2021) 2021:103551. doi: 10.1016/j.scs.2021.103551
54. Wu G, Yang R, Li L, Bi X, Liu B, Li S, et al. Factors influencing the application of prefabricated construction in China: from perspectives of technology promotion and cleaner production. J Clean Prod. (2019) 219:753–62. doi: 10.1016/j.jclepro.2019.02.110
55. Wu Z, Jiang M, Li H, Zhang X. Mapping the knowledge domain of smart city development to urban sustainability: a scientometric study. J Urb Technol. (2020). 28:29–53. doi: 10.1080/10630732.2020.1777045
56. Tabassum S, Pereira FSF, Fernandes S, Gama J. Social network analysis: an overview. Wiley Interdisciplin Rev. (2018) 8:e1256. doi: 10.1002/widm.1256
57. Erol A, David H. Social finance as cultural evolution, transmission bias, and market dynamics. Proc Natl Acad Sci USA. (2021). 2021:e2015568118. doi: 10.1073/pnas.2015568118
58. Son J-Y, Bhandari A, FeldmanHall O. Cognitive maps of social features enable flexible inference in social networks. Proc Nat Acad Sci USA. (2021) 118:e2021699118. doi: 10.1073/pnas.2021699118
59. Nunes M, Abreu A. Applying social network analysis to identify project critical success factors. Sustainability. (2020). 12: 1503. doi: 10.3390/su12041503
60. Tan Y, Shuai C, Shen L, Hou L, Zhang G. A study of sustainable practices in the sustainability leadership of international contractors. Sustain Dev. (2020) 28:697–710. doi: 10.1002/sd.2020
61. Carrington PJ, Scott J, Wasserman S. Models and Methods in Social Network Analysis. Vol. 28. Cambridge: Cambridge University Press (2005). doi: 10.1017/CBO9780511811395
62. Freeman LC. Centrality in social networks conceptual clarification. Soc Networks. (1978) 1:215–39. doi: 10.1016/0378-8733(78)90021-7
63. Zhao J, Peng Z, Liu L, Yu Y, Shang Z. Public space layout optimization in affordable housing based on social network analysis. Land. (2021) 10:955. doi: 10.3390/land10090955
64. Altes WKK, Tambach M. Municipal strategies for introducing housing on industrial estates as part of compact-city policies in the Netherlands. Cities. (2008) 25:218–29. doi: 10.1016/j.cities.2008.04.005
65. Sun Q, Wu Q, Cheng J, Tang P, Li S, Mei Y. How industrialization stage moderates the impact of China's low-carbon pilot policy? Sustainability. (2020) 12:10577. doi: 10.3390/su122410577
66. Zhang J, Xie H, Li H. Positioning and priorities of growth management in construction industrialization: Chinese firm-level empirical research. Sustainability. (2017). 9: 1105. doi: 10.3390/su9071105
67. Yang L, Chen Y, Xu N, Zhao R, Chau KW, Hong S. Place-varying impacts of urban rail transit on property prices in Shenzhen, China: insights for value capture. Sustain Cities Soc. (2020) 58:102140. doi: 10.1016/j.scs.2020.102140
68. Yuan J, Chen K, Li W, Ji C, Wang Z, Skibniewski MJ. Social network analysis for social risks of construction projects in high-density urban areas in China. J Clean Prod. (2018) 198:940–61. doi: 10.1016/j.jclepro.2018.07.109
69. Yang L, Chau KW, Szeto WY, Cui X, Wang X. Accessibility to transit, by transit, and property prices: spatially varying relationships. Transp Res D Transp Environ. (2020) 85:102387. doi: 10.1016/j.trd.2020.102387
70. Yang L, Chu X, Gou Z, Yang H, Lu Y, Huang W. Accessibility and proximity effects of bus rapid transit on housing prices: heterogeneity across price quantiles and space. J Transp Geogr. (2020) 88:102850. doi: 10.1016/j.jtrangeo.2020.102850
71. Huo B. The impact of supply chain integration on company performance: an organizational capability perspective. Supply Chain Manage Int J. (2021) 2012:1359–8546. doi: 10.1108/13598541211269210
Keywords: prefabrication, contractor, key factors, social network analysis, China
Citation: Zhang J, Xiang P, Zhong J, Zhang J, Wu Z and Antwi-Afari MF (2022) Exploring Key Factors for Contractors in Opening Prefabrication Factories: A Chinese Case Study. Front. Public Health 10:837350. doi: 10.3389/fpubh.2022.837350
Received: 16 December 2021; Accepted: 04 January 2022;
Published: 03 February 2022.
Edited by:
Linchuan Yang, Southwest Jiaotong University, ChinaReviewed by:
Saina Zheng, Southeast University, ChinaZhiqian Zhang, The University of Hong Kong, Hong Kong SAR, China
Copyright © 2022 Zhang, Xiang, Zhong, Zhang, Wu and Antwi-Afari. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
*Correspondence: Pengcheng Xiang, pcxiang@cqu.edu.cn