![Man ultramarathon runner in the mountains he trains at sunset](https://d2csxpduxe849s.cloudfront.net/media/E32629C6-9347-4F84-81FEAEF7BFA342B3/0B4B1380-42EB-4FD5-9D7E2DBC603E79F8/webimage-C4875379-1478-416F-B03DF68FE3D8DBB5.png)
94% of researchers rate our articles as excellent or good
Learn more about the work of our research integrity team to safeguard the quality of each article we publish.
Find out more
CORRECTION article
Front. Energy Res. , 11 September 2023
Sec. Sustainable Energy Systems
Volume 11 - 2023 | https://doi.org/10.3389/fenrg.2023.1249104
This article is part of the Research Topic Sustainable Planning and Life-Cycle Thinking of Energy Infrastructure, Volume II View all 4 articles
This article is a correction to:
Assessing the viability of a grid-connected PV power plant in Mubi, Adamawa State, Nigeria
A Corrigendum on
Assessing the viability of a grid-connected PV power plant in Mubi, Adamawa State, Nigeria
by Luqman R, Kehinde Issa A-J, Owolabi AB, Yakub AO, Same NN, Yahaya A, Yasin N, Kavgic M, Suh D and Huh J-S (2023). Front. Energy Res. 11:1205646. doi: 10.3389/fenrg.2023.1205646
In the published article, an Author name was incorrectly written as “Navid Yasin”. The correct spelling is “Naveed Yasin.”
In the published article, there was an error in the Author list, and author “Abdullahi Yahaya” was erroneously excluded. The corrected Author list appears below.
“Raji Luqman1,2, Abdul-Jeleel Kehinde Issa1, Abdulhameed Babatunde Owolabi3,4, Abdulfatai Olatunji Yakub4, Noel Ngando Same4, Abdullahi Yahaya4, Navid Yasin5, Miroslava Kavgic6, Dongjun Suh4*, Jeung-Soo Huh4,7.”
The authors apologize for these errors and state that this does not change the scientific conclusions of the article in any way. The original article has been updated.
All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.
Keywords: solar photovoltaic, RETScreen expert, solar energy, renewable energy, techno-economic, sustainability
Citation: Luqman R, Kehinde Issa A-J, Owolabi AB, Yakub AO, Same NN, Yahaya A, Yasin N, Kavgic M, Suh D and Huh J-S (2023) Corrigendum: Assessing the viability of a grid-connected PV power plant in Mubi, Adamawa State, Nigeria. Front. Energy Res. 11:1249104. doi: 10.3389/fenrg.2023.1249104
Received: 28 June 2023; Accepted: 01 September 2023;
Published: 11 September 2023.
Approved by:
Frontiers Editorial Office, Frontiers Media SA, SwitzerlandCopyright © 2023 Luqman, Kehinde Issa, Owolabi, Yakub, Same, Yahaya, Yasin, Kavgic, Suh and Huh. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
*Correspondence: Dongjun Suh, ZG9uZ2p1bnN1aEBrbnUuYWMua3I=
Disclaimer: All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.
Research integrity at Frontiers
Learn more about the work of our research integrity team to safeguard the quality of each article we publish.